Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana
Dashboard Rekapitulasi Alur Produksi

Rekapitulasi Produksi

Pemantauan alur produksi per pallet

Total Jumlah
47,524 Pcs
Total Volume
750,287.1672 m³
No Pallet Grade Tebal Lebar Panjang Proses P1 Proses P2 Status Produksi
GS P1 Dempul P1 Sanding P1 Check P1 PTS P1 Bagus P1 GS P2 Dempul P2 Sanding P2 Grading P2 PTS P2 Bagus P2 (Final)
420 MA B4 G1 14.60 920.00 1,830.00 40 40 40 40 0 40 40 40 40 21 0 21 Siap Finishing/Packing
420//478 FA B4 CI 17 15.00 1,220.00 2,440.00 50 50 50 50 0 50 50 50 50 0 0 0 Sanding P2
420//x FA B4 CI 17 15.00 1,220.00 2,440.00 28 28 28 28 0 28 28 28 28 0 0 0 Sanding P2
421 MA B4 G1 8.60 1,220.00 2,440.00 50 50 50 0 0 0 0 0 0 0 0 0 Sanding P1
421//894 MA B4 G1 8.60 1,220.00 2,440.00 80 80 0 0 0 0 0 0 0 0 0 0 Dempul P1
422 MA B4 G1 11.60 920.00 1,830.00 29 29 29 29 0 29 29 29 29 0 0 0 Sanding P2
423 FA B4 G2 11.60 915.00 1,830.00 59 59 59 59 0 59 59 59 59 0 0 0 Sanding P2
425 MA B4 G1 11.60 920.00 1,830.00 59 59 59 59 0 59 59 59 59 0 0 0 Sanding P2
426 FA B4 G2 11.60 910.00 1,820.00 60 60 60 0 0 0 0 0 0 0 0 0 Sanding P1
428 FJB E1 UTY E 2.70 915.00 1,830.00 164 164 164 164 0 164 164 164 164 0 0 0 Sanding P2