Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
548 804 2.40 915.00 1830.00 FM E1 UTY E 200 (Sisa: 0)
547 731 2.40 915.00 1830.00 FM E1 UTY E 230 (Sisa: 0)
546 797//796 8.60 915.00 1830.00 MA B4 G1 40 (Sisa: 0)
545 795 8.20 915.00 1830.00 MA B4 G1 79 (Sisa: 0)
544 778//782 2.40 915.00 1830.00 FM E1 UTY E 232 (Sisa: 0)
542 904 2.40 915.00 1830.00 FM E1 UTY E 236 (Sisa: 0)
541 789 2.40 915.00 1830.00 FM E1 UTY E 204 (Sisa: 0)
540 823//821 8.60 1220.00 2440.00 MA B4 G1 72 (Sisa: 0)
539 777//776 15.00 1220.00 2440.00 FA B4 CI 17 41 (Sisa: 0)
538 796//801 8.60 915.00 1830.00 MA B4 G1 80 (Sisa: 0)
Total: 499 data
< Prev Halaman 2 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
104 74 2026-09-04 September 36 285 Shift B DS2 60 11.60 0.017556 1.053343 Delete
103 124 2026-09-03 September 36 416 Shift A DS1 60 11.60 0.017556 1.053343 Delete
102 117 2026-09-03 September 36 1 Shift A DS1 27 14.60 0.040484 1.093081 Delete
101 112 2026-09-03 September 36 405 Shift A DS1 44 14.60 0.040816 1.795918 Delete
100 111 2026-09-03 September 36 346 Shift A DS1 31 20.50 0.058048 1.799476 Delete
99 110 2026-09-03 September 36 378 Shift A DS1 30 20.50 0.058048 1.741428 Delete
98 98 2026-09-03 September 36 423 Shift A DS1 59 11.60 0.017749 1.047201 Delete
97 97 2026-09-03 9 36 391 A DS1 62 11.60 0.017749 1.100449 Delete
96 91 2026-09-03 September 36 386 Shift A DS1 60 11.60 0.017749 1.064950 Delete
95 86 2026-09-03 September 36 328 Shift A DS1 40 17.60 0.049820 1.992797 Delete
Menampilkan Halaman 47 dari 54 (Total: 536 data)